Full measured survey of 9-15 Cheapside, City of London. Including floor plans, roof plans, sections and elevations. (Project lasting 4 months) (2004).
Full measured survey of Maritime Organisation building London. (2004).
Redevelopment of Kings Cross Underground Station. (2001).
Measured floor plans of 40 Nat west Banks for Royal Bank of Scotland (2002).
Full measured survey of Mermaid Theatre, City of London. Including floor plans, roof plans, sections and elevations. (2004).
Topographical survey of Southwark Cathedral, London (1990s).
Full measured survey of Prince Edward Theatre London. (1990s).
Redevelopment of Wimbledon all England Tennis Club (1990s).